RFP  NO

 

MSU – COOLEY LAB RENOVATION RFP’S

DESCRIPTION/TITLE

APPROVED – C/O #

 

WORK COMPLETED

OR SCHEDULE DATE

 

 

 

 

 

108

 

Provide Tackboards

Change Order 12

May 2013

107

 

Install Door between Rm 029 and 005E

Change Order 12

May 2013

106

 

Add Gutter & Downspout @ North Entry Area

Change Order 12

April 2013

105

 

Additional snow guards at North Roof

Change Order 12

March 2013

104

 

Revise condensate piping @ EQ4 & Autoclaves

Change Order 12

March 2013

103

 

Meters for Steam Generators SG-1 and Autclaves steam gen.

Change Order 12

February 2013

102

 

Solenoids @ EQ4 Steam Generators

Change Order 12

February 2103

101

 

Additional Shelving in Room 315A

Change Order 12

February 2013

100

 

Intermediate shelf at Custom Tables (3)

Change Order 12

February 2013

99

 

Additional Specialty Signage

Change Order 12

February 2013

98

 

Trash receptacles

Change Order 12

February 2013

97

 

BACnet Interface for Heat Pump HP-1

Change Order 12

February 2013

96

 

Door Handle Replacement for Incubator

Change Order 12

February 2013

95

 

Tubing for Incubators (4) @ four locations

Change Order 12

February 2013

94

 

Revise Electrical Power at Laser Tables

Change Order 12

February 2013

93

 

Provide MED Table for Rm 114

Change Order 12

February 2013

92

 

Provide Blackout Curtains 1st 3rd and 4th floors

Change Order 12

February 2013

91

 

Painting Extras

Change Order 12

February 2013

90

 

Place LAC-1 Lab Air Compressor on Emergency Power

Change Order 12

January 2013

89

 

Fire Sprinkler Bracing @ Penthouse

Change Order 12

January 2013

88

 

Autoclave storage shelving

Change Order 12

January 2013

87

 

New Under Shelving Lighting

Change Order 12

January 2013

86

 

New Lighting @ Lab Sinks

Change Order 11

January 2013

85

 

Revisions to Room 228A – Lab Air/Black-out Curtains

Change Order 11

February 2013

84

 

Add 208v receptacle in Room 430

Change Order 10

January 2013

83

 

Relocate AHU Light Switch

Change Order 10

January 2013

82

 

Laser Lab Cord Ends

Change Order 10

January 2013

81

 

Phase 3 Post Modifications

Change Order 10

February 2013

80

 

Provide Relief on Chilled Water Return

Change Order #9

November 2012

79

 

Provide Chilled Water Bypass & Control Valving

Change Order #9

November 2012

78

 

Provide Stainless Steel Shelving @ ARC Corridor Closet

Change Order #10

November 2012

77

 

West Entry Canopy Revisions

Change Order #9

October 2012

76

 

Revisions to Autoclave Rm 028

Change Order #9

October 2012

75

 

POST Modifications

Change Order #9

November 2012

74

 

Compressed Air to Laser Tables (5 locations)

Change Order #9

October 2012

73

 

Elevator GFCI Light and Light Switch

Change Order #9

October 2012

72

 

HWS/HWR lines to Cabinet Heater in Lewis Entry Vestibule

Change Order #9

October 2012

71

 

Door Changes 006B 000 and 001

Change Order #9

October 2012

70

 

Provide Landscaping & Irrigation North of Taylor Hall

Change Order #9

September 2012

69

 

Remove & Replace Mirrors & Sinks (9) Locations

Change Order #9

September 2012

68

 

Provide Seating per the attached schedule

Change Order #9

September 2012

67

 

Provide Water Softener & Hot Water Control Valve EQ5-6 & 7

Change Order #9

September 2012

66

 

Provide Bypass Loop for Water Meter

Change Order #9

September 2012

65

 

Provide Ladder & Guardrail @ Abandoned Elevator Pit

Change Order #8

September 2012

64

 

Add Bypass Loop @ ARC condensate meter – revise PC routing

Change Order #8

September 2012

63

 

Replace Plumbing Fixtures @ Rm 129

Change Order #8

September 2012

62

 

(3 Laser Tables & Accessories

Change Order #7

October 2012

61

 

Spring Mounts @ Penthouse on Pipe Risers

Change Order #8

August 2012

60

 

Mechanical Louver Change L5 & L6

Change Order #8

August 2012

59

 

Remove Steel Column @ Door 102D

Change Order #8

August 2012

58

 

Provide AED

Change Order #8

August 2012

57

 

Lab 011 Casework Revisions & T-Stat relocation

Change Order #8

August 2012

56

 

Delete Site Lighting

Change Order #7

July 2012

55

 

Revise HVAC  Access Doors

Change Order #7

July 2012

54

 

Delete Bypass Valving at HWC-1 & HWC-2

Change Order #7

July 2012

53

 

Add Chemical Bypass Feeders

Change Order #7

July 2012

52

 

Revise Shelving – add finished edging

Change Order #7

July 2012

51

 

Cut and Cap Storm Sewer

Change Order #7

July 2012

50

 

Delete Sheet Metal From South Roof Assembly

Change Order #7

May 2012

49

 

Delete Steam Relief Assembly

Pending Pricing

June 2012

48

 

Replace SDR Pipe with Ductile Iron @ Tunnel

APP CHANGE ORDER 6

June 2012

47

 

Elevator Cab Heater

Change Order #6

June 2012

46

 

Concrete Sill @ Curtain Wall -

Change Order #6

May 2012

45

 

Taylor Hall East Addition Foundation Waterproofing

Change Order #6

May 2012

44

 

Concrete Well @ Louver L6

Change Order #6

May 2012

43

 

Site Fencing

Pending Pricing

June 2012

42

 

Stair Landings & Treads

Pending MSU Approval

July  2012

41

 

Ceramic Tile @ Lewis Restroom Rm 129

Change Order #6

June  2012

40

 

Chiller  Eddy Testing -

Change Order #6

May 2012

39

 

INFill Elevator Shaft East Elevation Lower Level

Change Order #6

May 2012

38

 

Revised Landscaping Drawing

Allowance-Bid

May 2012

37

 

Delete VCT in Autoclave Rm 007

Change Order #6

April 2012

36

 

Remove & Replace Duct Smoke Detectors – Keyed Test Switch

Change Order #6

May 2012

35

 

Revise Casework A-30 & B-30 Types Add Epoxy Resin Tops

Change Order #4

April 2012

34

 

Revise Emergency Shower Head Location

Pending Pricing

April 2012

33

 

Delete Wall Assembly & Door 102C

Change Order #6

April 2012

32

Alternate Road Access During Sanitary Sewer Work

Change Order #6

May 2012

31

 

Room 208 Electrical Power revisions

Change Order #4

April 2012

30

 

Elevator Revisions – Maintenance Req. MSU

Change Order #6

May 2012

29

 

Casework-- Architectural Interior

Pending Pricing

April 2012

28

Room 212 Additions - Markerboard Video Monitor

Change Order #4

April 2012

27

 

Video Monitors @ Collision Areas- Pipe Chase wall assembly

Change Order #4

April 2012

26

Basement Lighting Revisions

Change Order #4

April 2012

25

Lewis Skybridge Door security Revisions

Pending Pricing

May 2012

24

 

Vending Machines Power & Data

Change Order #3

March 2012

23

Entry Grates @ West Entry  & At ARC Entry

Change Order #6

May 2012

22

 

Revision to Building Signage

  NO COST

 

21

Delete VAC fittings/Piping

Change Order #4

February 2012

20

 

Revised Autoclave Options

Change Order #4

April 2012

19

Exposed GF CMU @ Basement Corridor

Change Order #3

March 2012

18

 

Building Directories

Change Order #4

May 2012

17

Unscheduled Booster Coils & ERV Controls

Change Order #3

March 2012

16b

 

Revise Cooley – Lewis South Entry

Change Order #7

August 2012

16

 

Revised Storm Drainage @ Lewis Hall Retaining Wall Area

Change Order #3

January 2012

15

High Impact  DENS ARMOR PLUS

Change Order #3

March 2012

14

 

Provisional Tees/Valves - Biobased Spray foam

Change Order #3

January 2012

13

a

Roof Plenum Drain Revisions

Change Order #3

January 2012

12

 

Door Security/Revisions

Change Order #3

May  2012

11

Lav Faucet Revision

Change Order #3

May 2012

10

 

Basement Slab removal/replacement

Change Order #2

December 2012

9

AHU Filter revisions

Change Order #2

May 2012

8

 

RO Flush system (additional tees)

Change Order #3

February  2012

7

Cooley Gas Meter-Utility reading system

Change Order #3

May 2012

6

Provisional Tees

 

 

6r

r

NW Building Heat

Change Order #4

February 2012

6B

ARC Corridor 125 Heat

Change Order#4

April 2012

6C

C

ARC Corridor Lighting

Change Order #4

April 2012

5

 

Dust Containment @ Autoclave ceiling (ARC)

Change Order #2

October 2011

4

 

Seismic Brick Issues - Spira Lok

OPEN

May  2012

4b

B

Parapet Revisions

Change Order #3

December 2011

3

Natural Gas Service to Lewis

Change Order #2

October 2011

2

 

Delete Liebert Unit Room 208

Change Order #2

October 2011

1

             Lewis Cooley Flat Roof Connector System

10-0023  Allowance Item

Pending – Start May 2012

1a

a

Revise Roof Drain piping

Change Order #3

March 2012