RFI NO |
DESCRIPTION/TITLE |
Drawing Specification Ref. |
INITIAL DATE |
SENT TO |
DATE REQUIRED BY |
RETURNED ON |
RESPONDED
BY |
|||||
|
|
|
|
|
|
|
|
|
|
||||
143 |
Fire Alarm Bell-FDC- Tamper Switch |
13000 |
9/10/2012 |
FDS-ADG |
9/17/2012 |
|
|
|
|||||
142 |
Fire Alarm Devices in Corridor ARC |
E2.1 |
9/6/2012 |
FDS-ADG |
9/13/2012 |
9/6/2012 |
DP-CMS |
|
|||||
141 |
Access Doors 004 |
08710 – H-4 HDWE Group |
9/04/2012 |
FDS-ADG |
9/11/2012 |
9/04/2012 |
FDS-ADG |
|
|||||
RFI 140 |
140 |
Scullery Sink |
QL1.0 |
8/30/2012 |
FDS-ADG |
9/06/2012 |
8/30/2012 |
MO-LeadEdge |
|
||||
139 |
Column Detail @ West Entry |
A8.0 Details 8 & 9 |
8/20/2012 |
FDS-ADG |
8/22/2012 |
4” CMU used |
GS-DAC |
|
|||||
138 |
Water Softener Loop ( Future) Glasswasher |
QL1.0 |
8/13/2012 |
FDS-ADG |
8/20/2012 |
8/30/2012 |
DP-CMS |
|
|||||
137r |
Fume Hood Height Revised Response |
M2.0.2 – QL1.0 |
7/18/2012 |
FDS-ADG |
7/25/2012 |
7/25/2012 |
DP-CMS |
|
|||||
137 |
Fume Hood Height Conflict with
Supply duct |
M2.0.2 QL1.0 |
7/18/2012 |
FDS-ADG |
7/25/2012 |
7/25/2012 |
DP-CMS |
|
|||||
136 |
Air & Gas Missing from Manifold
Lab 109 |
M2.1.1 |
7/17/2012 |
FDS-ADG |
7/24/2012 |
7/24/2012 |
DP-CMS |
|
|||||
135 |
Waste & Vent in Floor Lab 407 |
A1.9 M2.4.2 |
7/09/2012 |
FDS-ADG |
7/13/2012 |
7/28/2012 |
DP-CMS |
|
|||||
134 |
Nixalite on Knee Braces @ Roof |
Detail 2 A4.3 |
7/05/2012 |
FDS-ADG |
7/12/2012 |
7/05/2012 |
DP-CMS |
|
|||||
133 |
Fire Sprinkler Painting Pipe? |
NIH DRM |
7/03/2012 |
FDS-ADG |
7/10/2012 |
7/03/12 |
FDS-ADG |
|
|||||
132a |
Supplemental to Pipe Labels |
|
|
|
|
|
|
|
|||||
132 |
Pipe Labels |
15055.2.2.b |
7/03/2012 |
FDS-ADG |
7/09/2012 |
7/03/2012 |
FDS-ADG |
|
|||||
RFI131 |
131 |
Exterior Jambs @ West Windows |
D1.1-D1.4/ A4.3 Det7 A4.3 |
6/29/2012 |
FDS-ADG |
7/06/2012 |
7/03/2012 |
FDS-ADG |
|
||||
RFI130 |
130 |
Retaining Wall sitework
@ L-6 |
C1.1, C1.2 |
6/29/2012 |
FDS-ADG |
7/06/2012 |
|
|
|
||||
RFI129 |
129 |
Penthouse Lighting |
E2.5 |
06/20/2012 |
FDS-ADG |
6/27/2012 |
6/25/2012 |
BK-ADG |
|
||||
RFI128 |
128 |
Humidifier Piping |
1/M3.1 |
6/11/2012 |
FDS-ADG |
6/18/2012 |
6/15/2012 |
DB-GPD |
|
||||
RFI127 |
127 |
L-6 Intake louver Filter fan housing
|
M2.0.3 |
6/11/2012 |
FDS-ADG |
6/18/2012 |
6/15/2012 |
DB-GPD |
|
||||
126 |
Edge Banding on Island Shelving - PLam |
A.QL3.2 |
5/22/2012 |
FDS-ADG |
5/29/2012 |
6/4/2012 |
MO-Leadedge |
|
|||||
RFI125 |
125 |
Solar Wall liner |
Detail 12-13-14 A8.0 |
5/22/2012 |
FDS-ADG |
6/06/2012 |
|
|
|
||||
124 |
Sprinkler @ Electrical Vault |
A0.3 FP1.0 |
5/22/2012 |
FDS-ADG |
5/29/2012 |
5/22/2012 |
JA-Sprinktech |
|
|||||
123 |
Primer Fault @ Underside of Galv.
Roof |
FC.C/ A0.6 |
5/21/2012 |
FDS-ADG |
5/2/8/2012 |
Withdrawn by DAC |
|
|
|||||
122 |
Cable tray @ Basement Height issue |
E2.0 |
5/21/2012 |
FDS-ADG |
5/28/2012 |
5/21/2012 |
BK-GPD |
|
|||||
121 |
Receptacles Behind Fume Hood |
2/E2.1, 2/E2.3 & QL1.1 |
5/16/21 |
FDS-ADG |
5/23/2012 |
5/16/2012 |
BK-GPD |
|
|||||
120 |
Top of Shear Wall treatment East & West Stair |
|
5/14/2012 |
FDS-ADG |
5/21/2012 |
|
|
|
|||||
119 |
Seal Tite
requirement @ Flex Conduit in labs |
Electrical 16110-16155 |
5/4/2012 |
FDS-ADG |
5/11/2012 |
5/07/2012 |
BK-GPD |
|
|||||
118 |
Penthouse Light Switching |
E2.5 |
4/24/2012 |
FDS-ADG |
5/01/2012 |
4/25/2012 |
BK-GPD |
|
|||||
117 |
Cylinder Restraints interference |
E2.3 QL1.3 E2.4 QL 1.4 |
4/23/2012 |
FDS-ADG |
4/30/2012 |
4/24/2012 |
MO-Leadedge |
|
|||||
116 |
Condensate Piping from ARC/Tietz Valving |
Det 1/M3.1 RFI107 |
4/20/2012 |
FDS-ADG |
4/27/2012 |
4/26/2012 |
DB-GPD |
|
|||||
115 |
Steam
Relief Valve |
M2.02,
M3.1 Det 2/M3.1 Det
4/M3.6 |
4/20/2012 |
FDS-ADG |
4/27/2012 |
5/15/2012 |
DB-GPD |
|
|||||
114 |
Cooling Tower piping Insulation |
M2.02 |
4/17/2012 |
FDS-ADG |
4/20/12 |
4/19/12 |
DB-GPD |
|
|||||
113 |
Generator
& Fencing Plan Locations |
C1.2 |
4/16/12 |
FDS-ADG |
4/17/12 |
4/17/12 |
CV-MSU |
|
|||||
112 |
OWJ’s @ Elevator Addition |
3/S2.7 – 1/S3.3 & 9/S1.2 |
4/14/12 |
FDS-ADG |
4/20/12 |
4/16/12 |
JG-Aegis |
|
|||||
111 |
Emergency Generator Placement – Electrical Primary Ductbank |
C1.2 |
4/13/12 |
FDS-ADG |
4/20/12 |
4/19/12 |
DP-CMS |
|
|||||
110 |
Connection Detail 9/S3.1 Weld Vs.
Bolted cnt |
Detail 9 – S3.1 |
4/10/12 |
FDS-ADG |
4/17/12 |
4/14/12 |
JG-Aegis |
|
|||||
109 |
4” 3” Steam Isolation Valves – Space issue |
M3.1 |
4/06/12 |
FDS-ADG |
4/13/12 |
4/13/12 |
MSU/GPD |
|
|||||
108 |
Duplex Condensate Pump- Relocate |
M2.0.2 |
4/05/12 |
FDS-ADG |
4/12/12 |
4/13/12 |
MSU/GPD |
|
|||||
107 |
Condenser Line from ARC/Tietz 2 ½” -Size |
Detail 1- M3.1 |
4/05/12 |
FDS-ADG |
4/12/12 |
4/13/12 |
MSU/DB-GPD |
|
|||||
106 |
Acid Liner in Corrosive Cabinets - |
11601-2.2N |
04/05/12 |
FDS-ADG |
04/09/12 |
4/04/12 |
MO-Leadedge |
|
|||||
105 |
Pipe Insulation @ Walls-Floor Sleeving |
Detail 5/M3.4Spec. 15704.2.2.1 |
3/30/12 |
FDS-ADG |
4/05/12 |
3/30/12 |
DB-GPD |
|
|||||
104 |
Door Frames @ East Stair Rev to F-3 |
A9.3-.4, A1.3-.5-.7& .9 |
3/22/12 |
FDS-ADG |
3/29/12 |
3/22/12 |
FDS-ADG |
|
|||||
103 |
Condenser Water Piping System |
Detail 2/M3.2 Spec. 15704.2.2.1 |
3/20/12 |
FDS-ADG |
3/27/12 |
3/21/12 |
Progress Mtg 31 |
|
|||||
102 |
RO Water In Laser Dark Rm 021 |
QL1.0 – Detail 15QL4.1 QL0.2 & M2.0.2 |
3/19/12 |
FDS-ADG |
3/22/12 |
3/21/12 |
Progress Mtg 31 |
|
|||||
101 |
Exhaust Stacks EF1-2&3-4 Cricket/Curbing |
A3.0- A3.1 Detail 18 |
3/16/12 |
FDS-ADG |
3/23/12 |
3/16/12 |
FDS-ADG |
|
|||||
100 |
Coiling Door Hoist Door 010B @
Imaging |
A1.0 |
3/16/12 |
FDS-ADG |
3/22/12 |
3/16/12 |
FDS-ADG |
|
|||||
99 |
Door Swing West Elevation-105-203-303-403 |
A1.2-1.4-1.6 &1.8 |
3/16/12 |
FDS-ADG |
3/22/12 |
3/16/12 |
FDS-ADG |
|
|||||
98 |
Elevator Addition OWJ- Beam
Connection |
9/S2.1 |
3/9/12 |
FDS-ADG |
3/16/12 |
3/16//12 |
JG-Aegis |
|
|||||
97 |
Window sill treatment |
8/A8.1 |
3/8/12 |
FDS-ADG |
3/15/12 |
3/19/12 |
FDS-ADG |
|
|||||
96 |
Steam Control Valve Schedule |
M0.6 |
3/8/12 |
FDS-ADG |
3/14/12 |
3/30/12 |
DB-GPD |
|
|||||
95 |
Masonry Wall tie Elevator Addition |
detail 6&7 S2.7 |
2/28/12 |
FDS-ADG |
2/29/12 |
2/29/12 |
JG-AEGIS |
|
|||||
94 |
Fire Sprinkler main @ Lewis Hall |
FP1.0 |
2/27/12 |
FDS-ADG |
3/5/12 |
2/28/12 |
JA-FST |
|
|||||
93 |
Revise Wall @ 104 from K type to J |
|
2/22/12 |
FDS-ADG |
2/23/12 |
2/23/12 |
FDS-ADG |
|
|||||
92 |
W8 X 18 @ Elevator Addition |
Detail 3 @ S2.7 |
2/21/12 |
FDS-ADG |
2/25/12 |
2/22/12 |
JG-AEGIS |
|
|||||
91 |
Door Conflict @ 007 Utility Piping |
M2.0, A1.1 |
2/16/12 |
FDS-ADG |
2/23/12 |
2/29/12 |
DP-CMS |
|
|||||
90 |
Condensate Drains @ Fan Coil units |
M2.4.2-M2.3.2, M2.2.2 |
2/14/12 |
FDS-ADG |
2/21/12 |
3/8/12 |
DP-CMS |
|
|||||
89 |
Lighting in EQ Rms Fan Coil Unit Conflict |
M2.4.2-M2.3.2, M2.2.2 |
2/14/12 |
FDS-ADG |
2/21/12 |
2/17/12 |
BK-GPD |
|
|||||
88 |
Receptacle in Server Rooms |
Detail 2 @E2.1 E2.2 E2.3 E2.4 |
2/14/12 |
FDS-ADG |
2/21/12 |
2/28/12 |
DP-CMS |
|
|||||
87 |
Chiller Vibration Isolation |
|
2/8/12 |
FDS-ADG |
2/15/12 |
2/10/12 |
DB-GPD |
|
|||||
86 |
OH Coiling Door Lintel |
S1.2-S2.0 |
2/6/12 |
FDS-ADG |
2/13/12 |
2/9/2012 |
FDS-ADG |
|
|||||
85 |
Elevated Slab @ Elevator Addition |
S2.1-Detail 2/S2.7 |
2/2/12 |
FDS-ADG |
2/2/12 |
2/3/12 |
JG-AEGIS |
|
|||||
|
85 |
Booster Coil Schedule |
M2.4.2, M2.2.1, M0.5 |
2/1/12 |
FDS-ADG |
2/2/12 |
RFP 17 |
RFP 17 |
|
||||
84 |
Fiberglass Insulation instead of Rigid @ Box Beams |
3/A5.1 |
1/30/12 |
FDS-ADG |
2/6/12 |
1/30/12 |
FDS-ADG |
|
|||||
83 |
Color Unistrut-Misc. Metals |
12345 - 2.10 |
1/30/12 |
FDS-ADG |
2/6/12 |
2/15/12 |
CRV-MSU |
|
|||||
82 |
Exterior Light Locations North |
E4.0, E2.1 |
1/26/12 |
FDS-ADG |
2/6/12 |
1/26/12 |
BK-GPD |
|
|||||
81 |
Electrical Outlet Location Rm 115 |
E2.1, A1.3 |
1/26/12 |
FDS-ADG |
2/6/12 |
1/26/12 |
withdrawn |
|
|||||
RFI 80 |
80 |
Exterior Hose Bibs Locations |
M2.03 |
1/24/12 |
FDS-ADG |
1/31/12 |
1/26/12 |
DB-GPD |
|
||||
80 |
Relocate Hose Bibs |
M2.03 |
1/24/12 |
FDS-ADG |
2/21/12 |
2/21/12 |
DB-GPD |
|
|||||
79 |
Roof decking metal roof weld inspections |
S0.1 S0.2 |
1/18/12 |
FDS-ADG |
1/23/12 |
1/19/12 |
JG-AEGIS |
|
|||||
78 |
Mounting Heights for Exterior Lights North |
E2.1 |
1/16/12 |
FDS-ADG |
1/23/12 |
1/18/12 |
BK-GPD |
|
|||||
77 |
Rebar Hook Bars @ Elevator Addition |
12/S1.2-- 10/S1.1 |
1/16/12 |
FDS-ADG |
1/23/12 |
1/17/12 |
JG-AEGIS |
|
|||||
76 |
Shear Wall interupt @ Basement Utilitities |
S2.0 Detail 1/S2.7 |
1/16/12 |
FDS-ADG |
1/23/12 |
1/17/12 |
JG-AEGIS |
|
|||||
75 |
Locations of Penthouse Floor drains |
S2.5 - M2.5 |
1/16/12 |
FDS-ADG |
1/23/12 |
1/17/12 |
DB-GPD |
|
|||||
74 |
Fan Coil Air Flow direction |
M2.0.3, M2.1.2, M2.2.2, M2.3.2, M2.4.2 |
1/16/12 |
FDS-ADG |
1/23/12 |
1/17/12 |
DB-GPD |
|
|||||
73 |
Domestic Water Supply Basement |
M3.1 Det. 4/M2.0.2 |
1/9/12 |
FDS-ADG |
1/16/12 |
1/11/12 |
DB-GPD |
|
|||||
72 |
Elevator Foundation Addition 4" to the north |
2/S3.3 |
1/9/12 |
FDS-ADG |
1/16/12 |
1/16/2012 |
JG-AEGIS |
|
|||||
71 |
Replace Insulation with Grout @ CMU |
Wall M.1 - A0.7 |
1/4/12 |
FDS-ADG |
1/10/12 |
1/4/12 |
FDS-ADG |
|
|||||
70 |
Dowels @ CMU Walls Elevator Add |
5/S0.1 8/S1.2 & 9/S1.2 |
1/4/12 |
FDS-ADG |
1/10/12 |
1/4/12 |
JG-AEGIS |
|
|||||
69 |
Insta Hot Water heater disconnects |
E2.1-E2.2-E2.3 & E2.4 |
12/20/11 |
FDS-ADG |
12/27/11 |
12/22/11 |
BK-GPD |
|
|||||
68 |
RO Water Piping diagram |
M2.0.2 -- M2.5 |
12/20/11 |
FDS-ADG |
12/27/11 |
12/28/11 |
DB-GPD |
|
|||||
67 |
Floor Drains @ Penthouse Floor |
M2.5 |
12/20/11 |
FDS-ADG |
12/27/11 |
12/28/11 |
DB-GPD |
|
|||||
66 |
Electrical Panels @ Basement Corridor |
E/E2.0 |
12/20/11 |
FDS-ADG |
12/27/11 |
12/22/11 |
FDS-ADG |
|
|||||
65 |
Elevator Sump Pump-No Circuitry |
E2.0-M2.0.3 |
12/20/11 |
FDS-ADG |
12/27/11 |
12/22/11 |
BK-GPD |
|
|||||
64 |
Electrical for RFP 6B |
RFP 6B- CM-3 |
12/20/11 |
FDS-ADG |
12/27/11 |
12/22/11 |
BK-GPD |
|
|||||
63 |
Electrical Outlets @ Vending Machines |
E2.2 - A4.1 |
12/13/11 |
FDS-ADG |
12/20/11 |
12/14/11 |
BK-GPD |
|
|||||
62 |
Wall Shelving Standards |
Spec 12345.2.11 |
12/12/11 |
FDS-ADG |
12/16/11 |
12/14/11 |
MO-Leadedge |
|
|||||
61 |
Diffuser Locations @ End of Corridors |
M2.2.2- M2.3.2 - M2.4.2 |
12/5/11 |
FDS-ADG |
12/12/11 |
12/20/11 |
DB-GPD |
|
|||||
60 |
VFD Testing Report Requirements |
SPEC Section 15180 |
12/2/11 |
FDS-ADG |
12/9/11 |
12/20/11 |
DB-GPD |
|
|||||
59 |
Helical Piers @ Cooley GL 9 wall |
S2.7 |
12/1/11 |
FDS-ADG |
12/5/11 |
12/2/11 |
JG-AEGIS |
|
|||||
58 |
Electrical Outlets @ Lab benches |
|
11/29/11 |
FDS-ADG |
11/29/11 |
11/29/11 |
MO-Leadedge |
|
|||||
57 |
Helical Pier @ ARC entrance |
2/S2.7 A1.3 |
11/22/11 |
FDS-ADG |
11/29/11 |
11/23/11 |
JG-AEGIS |
|
|||||
56 |
MUDRings on Elect. Boxes Data drops |
E0.1- E4.0 |
11/17/11 |
CV-MSU |
11/24/11 |
11/17/11 |
CV-MSU |
|
|||||
55 |
Mobile Casework Services |
4/QL3.1- M2.1.1-M2.4.2 |
11/17/11 |
FDS-ADG |
11/24/11 |
11/21/11 |
MO-Leadedge |
|
|||||
54 |
Air - Gas & Vac in Laser Lab - 010 |
QL1.0-M2.0.2-M2.0.3 |
11/11/11 |
FDS-ADG |
11/18/11 |
11/22/11 |
MO-Leadedge |
|
|||||
53 |
Is a Laser Warning Light required @laser lab |
Room 010 entries from Corridor |
11/10/11 |
FDS-ADG |
11/17/11 |
11/18/11 |
BK-GPD |
|
|||||
52 |
No Substrate @ Roof eaves |
A3.0-A6.0-A6.2-A0.6 |
10/31/11 |
FDS-ADG |
11/15/11 |
11/9/11 |
FDS-ADG |
|
|||||
51 |
Receptacle Type |
E4.0 Detail 1 & 2 |
10/25/11 |
FDS-ADG |
11/1/11 |
11/3/11 |
BK-GPD |
|
|||||
50 |
Opening @ Exhaust Stacks Decking support |
S2.6-14/S3.0 |
10/20/11 |
FDS-ADG |
10/27/11 |
10/28/11 |
FDS-ADG |
|
|||||
49 |
Knee Brace Bolts @ Void Space |
6/S3.0 |
10/19/11 |
FDS-ADG |
10/26/11 |
10/20/11 |
JG-AEGIS |
|
|||||
48 |
Lumber Core Plywood vs Veneer Ply |
12345.2.2.C.1 |
10/17/11 |
FDS-ADG |
10/24/11 |
10/18/11 |
MO-Leadedge |
|
|||||
47 |
Bathroom Heating (None) |
M2.2.1-M2.3.1-M2.4.1 |
10/13/11 |
FDS-ADG |
10/20/11 |
10/13/11 |
MB-GPD |
|
|||||
46 |
Level 5 Finishes |
|
10/14/11 |
FDS-ADG |
10/19/11 |
11/16/11 |
CV-MSU |
|
|||||
45 |
Unit Ventilator @ ARC 125 |
M2.1.2- |
10/12/11 |
FDS-ADG |
10/19/11 |
10/14/11 |
DB-GPD |
|
|||||
44 |
Spira Lok - type & size |
RFP 4r |
10/6/11 |
FDS-ADG |
10/13/11 |
10/7/11 |
JG-AEGIS |
|
|||||
43 |
Helical Pier @ Lewis Hall Restrooms |
2/S2.7 A1.3 |
10/6/11 |
FDS-ADG |
10/13/11 |
10/14/11 |
JG-AEGIS |
|
|||||
42 |
Exhaust Duct @ RM 315 |
M2.3.1 |
10/5/11 |
FDS-ADG |
10/12/11 |
10/7/11 |
MB-GPD |
|
|||||
41 |
Knee Brace closure cap |
2/S3.2 |
9/30/11 |
FDS-ADG |
10/6/11 |
10/4/11 |
FDS-ADG JG-AEGIS |
|
|||||
40 |
8" Sewer/Water line @ New Elevator Construction |
S2.7 |
10/3/11 |
DP-CMS |
10/3/11 |
10/3/11 |
DP-CMS |
|
|||||
39 |
Window vs. Ceiling Height |
A2.2 A2.3 |
9/28/11 |
FDS-ADG |
10/5/11 |
10/20/11 |
FDS-ADG |
|
|||||
38 |
Reroute UG Site Electrical |
ES1.0 |
9/25/11 |
FDS-ADG |
10/3/11 |
9/26/11 |
BK-GPD |
|
|||||
37 |
Reroute IW around ftg @ GL B7-C8 |
M2.0.1 M2.0.3 M2.1.2 |
9/25/11 |
FDS-ADG |
10/3/11 |
10/14/11 |
DB-GPD |
|
|||||
36 |
Add'l conduit for ATS 1 &2 |
ES1.0 E3.0 |
9/25/11 |
FDS-ADG |
10/3/11 |
9/26/11 |
BK-GPD |
|
|||||
35 |
Panel A Electrical Relocate |
E2.1 E2.2 E2.3 E2.4 |
10/6/11 |
FDS-ADG |
10/13/11 |
10/7/11 |
BK-GPD |
|
|||||
34 |
IW routing 2nd Flr to 1st GL4 conflict |
M2.2.1 |
9/22/11 |
FDS-ADG |
9/29/11 |
10/10/11 |
DB-GPD |
|
|||||
33 |
Exposed Piping GL8 |
M2.2.2 - A1.5 |
9/22/11 |
FDS-ADG |
9/29/11 |
|
|
|
|||||
32 |
Equipment relocation @ Rm 006 |
E2.0 |
9/21/11 |
FDS-ADG |
9/28/11 |
9/21/11 |
BK-GPD |
|
|||||
31 |
Shaft wall @ No. Rm 211 Delete |
A1.5- M2.2.2 |
9/114/11 |
FDS-ADG |
9/21/11 |
9/15/11 |
FDS-ADG |
|
|||||
30 |
Electrical Rm Layout 006 |
E2.0 |
9/14/11 |
FDS-ADG |
9/21/11 |
9/14/11 |
BK-GPD |
|
|||||
29 |
VFD manufacturers (two different allowed) |
15180.1.3.B |
9/13/11 |
FDS-ADG |
9/20/11 |
9/15/11 |
CV-MSU |
|
|||||
28 |
Helical @ Lewis Hall - Foundation |
15/S1.2 |
9/9/11 |
FDS-ADG |
9/16/11 |
9/12/11 |
JG-AEGIS |
|
|||||
27 |
PVC coated duct -- color |
|
9/7/11 |
FDS-ADG |
9/14/11 |
9/8/11 |
DB-GPD |
|
|||||
26 |
Helical @ Lewis Hall - Foundation |
15/S1.2 |
9/9/11 |
FDS-ADG |
9/16/11 |
9/12/11 |
JG-AEGIS |
|
|||||
25 |
Size of Domestic Hot water line and return line |
Note 1 M2.0.2 & Note 2 M2.1 |
8/29/11 |
FDS-ADG |
9/5/11 |
9/16/11 |
DB-GPD |
|
|||||
24 |
Power For emergenciy Showers |
E0.1 Note w |
8/29/11 |
FDS-ADG |
9/5/11 |
9/12/11 |
BK-GPD |
|
|||||
23 |
ICW @ Fume Hoods |
M2.4.1, QL1.4, QL3.1 |
9/6/11 |
FDS-ADG |
9/13/11 |
9/6/11 |
DB-GPD |
|
|||||
22 |
Spare conduits per raceway |
NOTE G E2.4 |
8/23/11 |
FDS-ADG |
8/30/11 |
8/23/11 |
BK-GPD |
|
|||||
21 |
Piping Conflicts with Helical Piers @ New Elevator |
S2.7-M2.1.2-M2.0.3 |
8/22/11 |
FDS-ADG |
8/29/11 |
8/23/11 |
FDS-ADG/DB-GPD |
|
|||||
20 |
Condenser Drain for Unit rm 116 |
M2.0.3 |
8/18/11 |
FDS-ADG |
8/25/11 |
8/22/11 |
MO-Leadedge |
|
|||||
19 |
Structural shop questions |
SPEC Section 5120 |
8/12/11 |
FDS-ADG |
8/19/11 |
8/12/11 |
JG-AEGIS |
|
|||||
18 |
Plumb. Conflict with beam 4th GL C3-4 |
M2.4.1-A1.8 S2.4 |
8/11/18 |
FDS-ADG |
8/18/11 |
8/18/11 |
FDS-ADG |
|
|||||
17 |
Door Glazing Pyrostop Glass |
A9.3 A9.4 |
8/11/11 |
FDS-ADG |
8/18/11 |
8/11/11 |
FDS-ADG |
|
|||||
16 |
Stair Railing Attachment detail |
6/A5.2 |
8/9/11 |
FDS-ADG |
8/16/11 |
8/15/11 |
JG-AEGIS |
|
|||||
15 |
Roof Plenum Drain Location |
M2.4.1 M2.4.2 M2.0.1 A1.8 A1.9 |
8/9/11 |
FDS-ADG |
8/9/11 |
8/19/11 |
DB-GPD |
|
|||||
14 |
Plumb Coord. @ Gridline 5 |
M2.1.2-M2.3.1-M2.4.2 A1.2-A1-6-A1.8 |
8/9/11 |
FDS-ADG |
8/16/11 |
8/19/11 |
DB-GPD |
|
|||||
13 |
Bentonite Waterproofing @ Foundation |
B/A5.1 B/A5.2 |
7/31/11 |
FDS-ADG |
8/15/11 |
8/11/11 |
FDS-ADG |
|
|||||
12 |
PVC vs Cast Iron Underslab |
M2.0.1 |
8/3/11 |
FDS-ADG |
8/10/11 |
8/5/11 |
DB-GPD |
|
|||||
11 |
Duct Chase sizes |
M2.0.2, M2.4.2, M2.7-A1.0-A1.9 |
8/11/11 |
FDS-ADG |
8/18/11 |
8/18/11 |
FDS-ADG |
|
|||||
10 |
Conduit within shear walls |
S2.0-S2.4 E2.0-E5.0 |
8/2/11 |
FDS-ADG |
8/8/11 |
8/2/11 |
JG-AEGIS |
|
|||||
9 |
Fire Rated Walls At 128 Closet |
A1.3 |
7/19/11 |
FDS-ADG |
7/25/11 |
7/21/11 |
FDS-ADG |
|
|||||
8 |
Penetrations @ FRP Strength SYS |
17/A8.1, 18/A8.1, A1.9, S2.4, FRP Submit |
7/8/11 |
FDS-ADG |
7/15/11 |
7/15/11 |
FDS-ADG |
|
|||||
7 |
Roof Drain Cooley Lewis Flat Connect |
A3.0, M2.0.1, D1.3 |
7/6/11 |
FDS-ADG |
7/12/11 |
* |
CV-MSU |
|
|||||
|
6 |
Utilities from Cooley to ARC |
Note 4 M1.0 |
7/6/11 |
FDS-ADG |
7/12/11 |
7/12/11 |
FDS-ADG |
|
||||
6a |
Utilities from Cooley to ARC/Lewis |
M2.0.2, M2.0.3, M3.1 |
7/15/11 |
FDS-ADG |
n/a |
11/3/11 |
DP-CMS |
|
|||||
5 |
Canopy @ Door 106 |
A3.0-S2.2 |
7/31/08 |
FDS-ADG |
8/7/08 |
7/1/11 |
FDS-ADG |
|
|||||
RFI 04 |
4 |
Knee Brace Flashing @ Sunshade |
A3.1 Det 4-13&14 Det 6/S3.2 |
6/24/11 |
FDS-ADG |
7/8/11 |
* |
OPEN |
|
||||
3 |
FUME HOOD TESTING |
11601 - Addendum #1 |
6/23/11 |
FDS-ADG |
7/7/11 |
7/28/11 |
FDS-ADG |
|
|||||
2 |
New Metal Stair Detail |
S2.4- Det 9 S3.1 Det 1 A8.2 |
6/19/11 |
FDS-ADG |
6/26/11 |
6/23/11 |
FDS-ADG |
|
|||||
1 |
TEST Document |
N/A |
6/8/11 |
DP-CMS |
N/A |
N/A |
COMPLETED |
|
|||||