RFI NO

 

                          DESCRIPTION/TITLE

Drawing

Specification Ref.

INITIAL DATE

SENT TO

DATE REQUIRED   BY

RETURNED ON

RESPONDED BY

 

 

 

 

 

 

 

 

 

 

RFI 143

143

Fire Alarm Bell-FDC- Tamper Switch

13000

9/10/2012

FDS-ADG

9/17/2012

 

 

 

RFI 142

142

Fire Alarm Devices in Corridor ARC

E2.1

9/6/2012

FDS-ADG

9/13/2012

9/6/2012

DP-CMS

 

RFI 141

141

Access Doors  004

08710 – H-4 HDWE Group

9/04/2012

FDS-ADG

9/11/2012

9/04/2012

FDS-ADG

 

RFI 140

140

Scullery Sink

QL1.0

8/30/2012

FDS-ADG

9/06/2012

8/30/2012

MO-LeadEdge

 

RFI 139

139

Column Detail @ West Entry

A8.0  Details 8 & 9

8/20/2012

FDS-ADG

8/22/2012

4” CMU used

GS-DAC

 

RFI138

138

Water Softener Loop ( Future) Glasswasher

QL1.0

8/13/2012

FDS-ADG

8/20/2012

8/30/2012

DP-CMS

 

RFI137r

137r

Fume Hood Height Revised Response

M2.0.2 – QL1.0

7/18/2012

FDS-ADG

7/25/2012

7/25/2012

DP-CMS

 

RFI 137

137

Fume Hood Height Conflict with Supply duct

M2.0.2  QL1.0

7/18/2012

FDS-ADG

7/25/2012

7/25/2012

DP-CMS

 

RFI 136

136

Air & Gas Missing from Manifold Lab 109

M2.1.1

7/17/2012

FDS-ADG

7/24/2012

7/24/2012

DP-CMS

 

RFI 135

135

Waste & Vent in Floor Lab 407

A1.9  M2.4.2

7/09/2012

FDS-ADG

7/13/2012

7/28/2012

DP-CMS

 

RFI134

134

Nixalite on Knee Braces @ Roof

Detail 2  A4.3

7/05/2012

FDS-ADG

7/12/2012

7/05/2012

DP-CMS

 

RFI133

133

Fire Sprinkler Painting Pipe?

NIH DRM

7/03/2012

FDS-ADG

7/10/2012

7/03/12

FDS-ADG

 

RFI132a

132a

Supplemental to Pipe Labels

 

 

 

 

 

 

 

RFI132

132

Pipe Labels

15055.2.2.b

7/03/2012

FDS-ADG

7/09/2012

7/03/2012

FDS-ADG

 

RFI131

131

Exterior Jambs @ West Windows

D1.1-D1.4/ A4.3 Det7 A4.3

6/29/2012

FDS-ADG

7/06/2012

7/03/2012

FDS-ADG

 

RFI130

130

Retaining Wall sitework @ L-6

C1.1, C1.2

6/29/2012

FDS-ADG

7/06/2012

 

 

 

RFI129

129

Penthouse Lighting

E2.5

06/20/2012

FDS-ADG

6/27/2012

6/25/2012

BK-ADG

 

RFI128

128

Humidifier Piping

1/M3.1

6/11/2012

FDS-ADG

6/18/2012

6/15/2012

DB-GPD

 

RFI127

127

L-6 Intake louver Filter fan housing

M2.0.3

6/11/2012

FDS-ADG

6/18/2012

6/15/2012

DB-GPD

 

RFI126

126

Edge Banding on Island Shelving - PLam

A.QL3.2

5/22/2012

FDS-ADG

5/29/2012

6/4/2012

MO-Leadedge

 

RFI125

125

Solar Wall liner

Detail 12-13-14 A8.0

5/22/2012

FDS-ADG

6/06/2012

 

 

 

RFI124

124

Sprinkler @ Electrical Vault

A0.3  FP1.0

5/22/2012

FDS-ADG

5/29/2012

5/22/2012

JA-Sprinktech

 

RFI123

123

Primer Fault @ Underside of Galv. Roof

FC.C/ A0.6

5/21/2012

FDS-ADG

5/2/8/2012

Withdrawn by DAC

 

 

RFI122

122

Cable tray @ Basement Height issue

E2.0

5/21/2012

FDS-ADG

5/28/2012

5/21/2012

BK-GPD

 

RFI121

121

Receptacles Behind Fume Hood

2/E2.1, 2/E2.3 & QL1.1

5/16/21

FDS-ADG

5/23/2012

5/16/2012

BK-GPD

 

RFI120

120

Top of Shear Wall treatment  East & West Stair

 

5/14/2012

FDS-ADG

5/21/2012

 

 

 

RFI 119

119

Seal Tite requirement @ Flex Conduit in labs

Electrical 16110-16155

5/4/2012

FDS-ADG

5/11/2012

5/07/2012

BK-GPD

 

RFI 118

118

Penthouse Light Switching

E2.5

4/24/2012

FDS-ADG

5/01/2012

4/25/2012

BK-GPD

 

RFI 117

117

Cylinder Restraints interference

E2.3 QL1.3 E2.4 QL 1.4

4/23/2012

FDS-ADG

4/30/2012

4/24/2012

MO-Leadedge

 

RFI 116

116

Condensate Piping from ARC/Tietz Valving

Det 1/M3.1  RFI107

4/20/2012

FDS-ADG

4/27/2012

4/26/2012

DB-GPD

 

RFI 115

115

Steam Relief Valve

M2.02, M3.1 Det 2/M3.1 Det 4/M3.6

4/20/2012

FDS-ADG

4/27/2012

5/15/2012

DB-GPD

 

RFI 114

114

Cooling Tower piping Insulation

M2.02

4/17/2012

FDS-ADG

4/20/12

4/19/12

DB-GPD

 

RFI 113

113

Generator & Fencing Plan Locations

C1.2

4/16/12

FDS-ADG

4/17/12

4/17/12

CV-MSU

 

RFI 112

112

OWJ’s @ Elevator Addition

3/S2.7 – 1/S3.3 & 9/S1.2

4/14/12

FDS-ADG

4/20/12

4/16/12

JG-Aegis

 

RFI 111

111

Emergency Generator Placement – Electrical Primary Ductbank

C1.2

4/13/12

FDS-ADG

4/20/12

4/19/12

DP-CMS

 

RFI 110

110

Connection Detail 9/S3.1 Weld Vs. Bolted cnt

Detail 9 – S3.1

4/10/12

FDS-ADG

4/17/12

4/14/12

JG-Aegis

 

RFI 109

109

4”  3” Steam Isolation Valves – Space issue

M3.1

4/06/12

FDS-ADG

4/13/12

4/13/12

MSU/GPD

 

RFI 108

108

Duplex Condensate Pump- Relocate

M2.0.2

4/05/12

FDS-ADG

4/12/12

4/13/12

MSU/GPD

 

RFI 107

107

Condenser Line from ARC/Tietz 2 ½” -Size

Detail 1- M3.1

4/05/12

FDS-ADG

4/12/12

4/13/12

MSU/DB-GPD

 

RFI 106

106

Acid Liner in Corrosive Cabinets -

11601-2.2N

04/05/12

FDS-ADG

04/09/12

4/04/12

MO-Leadedge

 

RFI 105

105

Pipe Insulation @ Walls-Floor Sleeving

Detail 5/M3.4Spec. 15704.2.2.1

3/30/12

FDS-ADG

4/05/12

3/30/12

DB-GPD

 

RFI 104

104

Door Frames @ East Stair Rev to F-3

A9.3-.4, A1.3-.5-.7& .9

3/22/12

FDS-ADG

3/29/12

3/22/12

FDS-ADG 

 

RFI 103

103

Condenser Water Piping System

Detail 2/M3.2 Spec. 15704.2.2.1

3/20/12

FDS-ADG

3/27/12

3/21/12

Progress Mtg 31

 

RFI 102

102

RO Water In Laser Dark Rm 021

QL1.0 – Detail 15QL4.1 QL0.2 & M2.0.2

3/19/12

FDS-ADG

3/22/12

3/21/12 

Progress Mtg 31 

 

RFI 101

101

Exhaust Stacks EF1-2&3-4  Cricket/Curbing

A3.0- A3.1 Detail 18

3/16/12

FDS-ADG

3/23/12

 3/16/12

FDS-ADG 

 

RFI 100

100

Coiling Door Hoist Door 010B @ Imaging

A1.0

3/16/12

FDS-ADG

3/22/12

 3/16/12

FDS-ADG 

 

RFI 99

99

Door Swing West Elevation-105-203-303-403

A1.2-1.4-1.6 &1.8

3/16/12

FDS-ADG

3/22/12

3/16/12 

FDS-ADG

 

RFI 98

98

Elevator Addition OWJ- Beam Connection

9/S2.1

3/9/12

FDS-ADG

3/16/12

3/16//12 

JG-Aegis

 

RFI 97

97

Window sill treatment

8/A8.1

3/8/12

FDS-ADG

3/15/12

3/19/12 

 FDS-ADG

 

RFI 96

96

Steam Control Valve Schedule

M0.6

3/8/12

FDS-ADG

3/14/12

 3/30/12

DB-GPD

 

RFI 95

95

Masonry Wall tie Elevator Addition

detail 6&7 S2.7

2/28/12

FDS-ADG

2/29/12

2/29/12

JG-AEGIS

 

RFI 94

94

Fire Sprinkler main @ Lewis Hall

FP1.0

2/27/12

FDS-ADG

3/5/12

2/28/12

JA-FST

 

RFI 93

93

Revise Wall @ 104 from K type to J

 

2/22/12

FDS-ADG

2/23/12

2/23/12

FDS-ADG

 

RFI 92

92

W8 X 18 @ Elevator Addition

Detail 3 @ S2.7

2/21/12

FDS-ADG

2/25/12

2/22/12

JG-AEGIS

 

RFI 91

91

Door Conflict @ 007 Utility Piping

M2.0, A1.1

2/16/12

FDS-ADG

2/23/12

2/29/12

DP-CMS

 

RFI 90

90

Condensate Drains @ Fan Coil units

M2.4.2-M2.3.2, M2.2.2

2/14/12

FDS-ADG

2/21/12

3/8/12

DP-CMS

 

RFI 89

89

Lighting in EQ Rms Fan Coil Unit Conflict

M2.4.2-M2.3.2, M2.2.2

2/14/12

FDS-ADG

2/21/12

2/17/12

BK-GPD

 

RFI 88

88

Receptacle in Server Rooms

Detail 2  @E2.1 E2.2 E2.3 E2.4

2/14/12

FDS-ADG

2/21/12

2/28/12

DP-CMS

 

RFI 87

87

Chiller Vibration Isolation

 

2/8/12

FDS-ADG

2/15/12

2/10/12

DB-GPD

 

RFI 86

86

OH Coiling Door Lintel

S1.2-S2.0

2/6/12

FDS-ADG

2/13/12

2/9/2012

FDS-ADG

 

RFI 85

85

Elevated Slab @ Elevator Addition

S2.1-Detail 2/S2.7

2/2/12

FDS-ADG

2/2/12

2/3/12

JG-AEGIS

 

RFI 85d

85

Booster Coil Schedule

M2.4.2, M2.2.1, M0.5

2/1/12

FDS-ADG

2/2/12

RFP 17

RFP 17

 

RFI 84

84

Fiberglass Insulation instead of Rigid @ Box Beams

3/A5.1

1/30/12

FDS-ADG

2/6/12

1/30/12

FDS-ADG

 

RFI 83

83

Color Unistrut-Misc. Metals

12345 - 2.10

1/30/12

FDS-ADG

2/6/12

2/15/12

CRV-MSU

 

RFI 82

82

Exterior Light Locations North

E4.0, E2.1

1/26/12

FDS-ADG

2/6/12

1/26/12

BK-GPD

 

RFI 81

81

Electrical Outlet Location Rm 115

E2.1, A1.3

1/26/12

FDS-ADG

2/6/12

1/26/12

withdrawn

 

RFI 80

80

Exterior Hose Bibs Locations

M2.03

1/24/12

FDS-ADG

1/31/12

1/26/12

DB-GPD

 

RFI 80.1

80

Relocate Hose Bibs

M2.03

1/24/12

FDS-ADG

2/21/12

2/21/12

DB-GPD

 

RFI 79

79

Roof decking metal roof weld inspections

S0.1  S0.2

1/18/12

FDS-ADG

1/23/12

1/19/12

JG-AEGIS

 

RFI 78

78

Mounting Heights for Exterior Lights North

E2.1

1/16/12

FDS-ADG

1/23/12

1/18/12

BK-GPD

 

RFI 77

77

Rebar Hook Bars @ Elevator Addition

12/S1.2-- 10/S1.1

1/16/12

FDS-ADG

1/23/12

1/17/12

JG-AEGIS

 

RFI 76

76

Shear Wall interupt @ Basement Utilitities

S2.0 Detail 1/S2.7

1/16/12

FDS-ADG

1/23/12

1/17/12

JG-AEGIS

 

RFI 75

75

Locations of Penthouse Floor drains

S2.5 - M2.5

1/16/12

FDS-ADG

1/23/12

1/17/12

DB-GPD

 

RFI 74

74

Fan Coil Air Flow direction

M2.0.3, M2.1.2, M2.2.2, M2.3.2, M2.4.2

1/16/12

FDS-ADG

1/23/12

1/17/12

DB-GPD

 

RFI 73

73

Domestic Water Supply Basement

M3.1  Det. 4/M2.0.2

1/9/12

FDS-ADG

1/16/12

1/11/12

DB-GPD

 

RFI 72

72

Elevator Foundation  Addition 4" to the north

2/S3.3

1/9/12

FDS-ADG

1/16/12

1/16/2012

JG-AEGIS

 

RFI 71

71

Replace Insulation with Grout @ CMU

 Wall M.1  -  A0.7

1/4/12

FDS-ADG

1/10/12

1/4/12

FDS-ADG

 

RFI 70

70

Dowels @ CMU Walls Elevator Add

5/S0.1  8/S1.2 & 9/S1.2

1/4/12

FDS-ADG

1/10/12

1/4/12

JG-AEGIS

 

RFI 69

69

Insta Hot Water heater disconnects

E2.1-E2.2-E2.3 & E2.4

12/20/11

FDS-ADG

12/27/11

12/22/11

BK-GPD

 

RFI 68

68

RO Water Piping diagram

M2.0.2 -- M2.5

12/20/11

FDS-ADG

12/27/11

12/28/11

DB-GPD

 

RFI 67

67

Floor Drains @ Penthouse Floor

M2.5

12/20/11

FDS-ADG

12/27/11

12/28/11

DB-GPD

 

RFI 66

66

Electrical Panels @ Basement Corridor

E/E2.0

12/20/11

FDS-ADG

12/27/11

12/22/11

FDS-ADG

 

RFI 65

65

Elevator Sump Pump-No Circuitry

E2.0-M2.0.3

12/20/11

FDS-ADG

12/27/11

12/22/11

BK-GPD

 

RFI 64

64

Electrical for RFP 6B

RFP 6B- CM-3

12/20/11

FDS-ADG

12/27/11

12/22/11

BK-GPD

 

RFI 63

63

Electrical Outlets @ Vending Machines

E2.2 - A4.1

12/13/11

FDS-ADG

12/20/11

12/14/11

BK-GPD

 

RFI 62

62

Wall Shelving Standards

Spec 12345.2.11

12/12/11

FDS-ADG

12/16/11

12/14/11

MO-Leadedge

 

RFI 61

61

Diffuser Locations @ End of Corridors

M2.2.2- M2.3.2 - M2.4.2

12/5/11

FDS-ADG

12/12/11

12/20/11

DB-GPD

 

RFI 60

60

VFD Testing Report Requirements

SPEC Section 15180

12/2/11

FDS-ADG

12/9/11

12/20/11

DB-GPD

 

RFI 59

59

Helical Piers @ Cooley GL 9 wall

S2.7

12/1/11

FDS-ADG

12/5/11

12/2/11

JG-AEGIS

 

RFI 58

58

Electrical Outlets @ Lab benches

 

11/29/11

FDS-ADG

11/29/11

11/29/11

MO-Leadedge

 

RFI 57

57

Helical Pier @ ARC entrance

2/S2.7  A1.3

11/22/11

FDS-ADG

11/29/11

11/23/11

JG-AEGIS

 

RFI 56

56

MUDRings on Elect. Boxes Data drops

E0.1- E4.0

11/17/11

CV-MSU

11/24/11

11/17/11

CV-MSU

 

RFI 55

55

Mobile Casework Services

4/QL3.1- M2.1.1-M2.4.2

11/17/11

FDS-ADG

11/24/11

11/21/11

MO-Leadedge

 

RFI 54

54

Air - Gas & Vac in Laser Lab - 010

QL1.0-M2.0.2-M2.0.3

11/11/11

FDS-ADG

11/18/11

11/22/11

MO-Leadedge

 

RFI 53

53

Is a Laser Warning Light required @laser lab

Room 010 entries from Corridor

11/10/11

FDS-ADG

11/17/11

11/18/11

BK-GPD

 

RFI 52

52

No Substrate @ Roof eaves

A3.0-A6.0-A6.2-A0.6

10/31/11

FDS-ADG

11/15/11

11/9/11

FDS-ADG

 

RFI 51

51

Receptacle Type

E4.0 Detail 1 & 2

10/25/11

FDS-ADG

11/1/11

11/3/11

BK-GPD

 

RFI 50

50

Opening @ Exhaust Stacks Decking support

S2.6-14/S3.0

10/20/11

FDS-ADG

10/27/11

10/28/11

FDS-ADG

 

RFI 49

49

Knee Brace Bolts @ Void Space

6/S3.0

10/19/11

FDS-ADG

10/26/11

10/20/11

JG-AEGIS

 

RFI 48

48

Lumber Core Plywood vs Veneer Ply

12345.2.2.C.1

10/17/11

FDS-ADG

10/24/11

10/18/11

MO-Leadedge

 

RFI 47

47

Bathroom Heating (None)

M2.2.1-M2.3.1-M2.4.1

10/13/11

FDS-ADG

10/20/11

10/13/11

MB-GPD

 

RFI 46

46

Level 5 Finishes

 

10/14/11

FDS-ADG

10/19/11

11/16/11

CV-MSU

 

RFI 45

45

Unit Ventilator @ ARC 125

M2.1.2-

10/12/11

FDS-ADG

10/19/11

10/14/11

DB-GPD

 

RFI 44

44

Spira Lok - type & size

RFP 4r

10/6/11

FDS-ADG

10/13/11

10/7/11

JG-AEGIS

 

RFI 43

43

Helical Pier @ Lewis Hall Restrooms

2/S2.7  A1.3

10/6/11

FDS-ADG

10/13/11

10/14/11

JG-AEGIS

 

RFI 42

42

Exhaust Duct @ RM 315

M2.3.1

10/5/11

FDS-ADG

10/12/11

10/7/11

MB-GPD

 

RFI 41

41

Knee Brace closure cap

2/S3.2

9/30/11

FDS-ADG

10/6/11

10/4/11

FDS-ADG  JG-AEGIS

 

RFI 40

40

8"  Sewer/Water line @ New Elevator Construction

S2.7

10/3/11

DP-CMS

10/3/11

10/3/11

DP-CMS

 

RFI 39

39

Window vs. Ceiling Height

A2.2 A2.3

9/28/11

FDS-ADG

10/5/11

10/20/11

FDS-ADG

 

RFI 38

38

  Reroute UG Site Electrical

ES1.0

9/25/11

FDS-ADG

10/3/11

9/26/11

BK-GPD

 

RFI 37

37

Reroute IW around ftg @ GL B7-C8

M2.0.1 M2.0.3 M2.1.2

9/25/11

FDS-ADG

10/3/11

10/14/11

DB-GPD

 

RFI 36

36

Add'l conduit for ATS 1 &2

ES1.0  E3.0

9/25/11

FDS-ADG

10/3/11

9/26/11

BK-GPD

 

RFI 35

35

Panel A Electrical Relocate

E2.1 E2.2 E2.3 E2.4

10/6/11

FDS-ADG

10/13/11

10/7/11

BK-GPD

 

RFI 34

34

IW routing 2nd Flr to 1st GL4 conflict

M2.2.1

9/22/11

FDS-ADG

9/29/11

10/10/11

DB-GPD

 

RFI 33

33

Exposed Piping GL8

M2.2.2 - A1.5

9/22/11

FDS-ADG

9/29/11

 

 

 

RFI 32

32

Equipment relocation @ Rm 006

E2.0

9/21/11

FDS-ADG

9/28/11

9/21/11

BK-GPD

 

RFI 31

31

Shaft wall @ No. Rm 211 Delete

A1.5- M2.2.2

9/114/11

FDS-ADG

9/21/11

9/15/11

FDS-ADG

 

RFI 30

30

Electrical Rm Layout 006

E2.0

9/14/11

FDS-ADG

9/21/11

9/14/11

BK-GPD

 

RFI 29

29

VFD manufacturers (two different allowed)

15180.1.3.B

9/13/11

FDS-ADG

9/20/11

9/15/11

CV-MSU

 

RFI 28

28

Helical @ Lewis Hall - Foundation

15/S1.2

9/9/11

FDS-ADG

9/16/11

9/12/11

JG-AEGIS

 

RFI 27

27

PVC coated duct -- color

 

9/7/11

FDS-ADG

9/14/11

9/8/11

DB-GPD

 

RFI 26

26

Helical @ Lewis Hall - Foundation

15/S1.2

9/9/11

FDS-ADG

9/16/11

9/12/11

JG-AEGIS

 

RFI 25

25

Size of Domestic Hot water line and return line

Note 1 M2.0.2 & Note 2  M2.1

8/29/11

FDS-ADG

9/5/11

9/16/11

DB-GPD

 

RFI 24

24

Power For emergenciy Showers

E0.1  Note w

8/29/11

FDS-ADG

9/5/11

9/12/11

BK-GPD

 

RFI 23

23

ICW @ Fume Hoods

M2.4.1, QL1.4, QL3.1

9/6/11

FDS-ADG

9/13/11

9/6/11

DB-GPD

 

RFI 22

22

Spare conduits per raceway

NOTE G E2.4

8/23/11

FDS-ADG

8/30/11

8/23/11

BK-GPD

 

RFI 21

21

Piping Conflicts with Helical Piers @ New Elevator

S2.7-M2.1.2-M2.0.3

8/22/11

FDS-ADG

8/29/11

8/23/11

FDS-ADG/DB-GPD

 

RFI 20

20

Condenser Drain for Unit rm 116

M2.0.3

8/18/11

FDS-ADG

8/25/11

8/22/11

MO-Leadedge

 

RFI 19

19

Structural shop questions

SPEC Section 5120

8/12/11

FDS-ADG

8/19/11

8/12/11

JG-AEGIS

 

RFI 18

18

Plumb. Conflict with beam 4th GL C3-4

M2.4.1-A1.8 S2.4

8/11/18

FDS-ADG

8/18/11

8/18/11

FDS-ADG

 

RFI 17

17

Door Glazing Pyrostop Glass

A9.3   A9.4

8/11/11

FDS-ADG

8/18/11

8/11/11

FDS-ADG

 

RFI 16

16

Stair Railing Attachment detail

6/A5.2

8/9/11

FDS-ADG

8/16/11

8/15/11

JG-AEGIS

 

RFI 15

15

Roof Plenum  Drain Location

M2.4.1 M2.4.2 M2.0.1 A1.8 A1.9

8/9/11

FDS-ADG

8/9/11

8/19/11

DB-GPD

 

RFI 14

14

Plumb Coord. @ Gridline 5

M2.1.2-M2.3.1-M2.4.2 A1.2-A1-6-A1.8

8/9/11

FDS-ADG

8/16/11

8/19/11

DB-GPD

 

RFI 13

13

Bentonite Waterproofing @ Foundation

B/A5.1 B/A5.2

7/31/11

FDS-ADG

8/15/11

8/11/11

FDS-ADG

 

RFI 12

12

PVC vs Cast Iron Underslab

M2.0.1

8/3/11

FDS-ADG

8/10/11

8/5/11

DB-GPD

 

RFI 11

11

Duct Chase sizes

M2.0.2, M2.4.2, M2.7-A1.0-A1.9

8/11/11

FDS-ADG

8/18/11

8/18/11

FDS-ADG

 

RFI 10

10

Conduit within shear walls

S2.0-S2.4 E2.0-E5.0

8/2/11

FDS-ADG

8/8/11

8/2/11

JG-AEGIS

 

RFI 09

9

Fire Rated Walls At 128 Closet

A1.3

7/19/11

FDS-ADG

7/25/11

7/21/11

FDS-ADG

 

RFI 08

8

Penetrations @ FRP Strength SYS

17/A8.1, 18/A8.1, A1.9, S2.4, FRP Submit

7/8/11

FDS-ADG

7/15/11

7/15/11

FDS-ADG

 

RFI 07

7

Roof Drain Cooley Lewis Flat Connect

A3.0, M2.0.1, D1.3

7/6/11

FDS-ADG

7/12/11

*

CV-MSU

 

RFI 06

6

Utilities from Cooley to ARC

Note 4 M1.0

7/6/11

FDS-ADG

7/12/11

7/12/11

FDS-ADG

 

RFI 06a

6a

Utilities from Cooley to ARC/Lewis

M2.0.2, M2.0.3, M3.1

7/15/11

FDS-ADG

n/a

11/3/11

DP-CMS

 

RFI 05

5

Canopy @ Door 106

A3.0-S2.2

7/31/08

FDS-ADG

8/7/08

7/1/11

FDS-ADG

 

RFI 04

4

Knee Brace Flashing @ Sunshade

A3.1 Det 4-13&14  Det 6/S3.2

6/24/11

FDS-ADG

7/8/11

*

OPEN

 

RFI 03

3

FUME HOOD TESTING

11601 - Addendum #1

6/23/11

FDS-ADG

7/7/11

7/28/11

FDS-ADG

 

RFI 02

2

New Metal Stair Detail

S2.4- Det 9 S3.1 Det 1 A8.2

6/19/11

FDS-ADG

6/26/11

6/23/11

FDS-ADG

 

TEST

1

TEST Document

N/A

6/8/11

DP-CMS

N/A

N/A

COMPLETED